Assigning and Re-assigning a Shift Pattern

If only one Shift Pattern exists within the Shift Pattern Schedule, perform the following to assign a second Shift Pattern:

If two Shift Patterns already exist, the second Shift Pattern can be Unassigned by performing the following:

If appropriate a new second Shift Pattern can be assigned.